sched: Nominate idle load balancer from a semi-idle package.
Currently the nomination of idle-load balancer is done by choosing the first idle cpu in the nohz.cpu_mask. This may not be power-efficient, since such an idle cpu could come from a completely idle core/package thereby preventing the whole core/package from being in a low-power state. For eg, consider a quad-core dual package system. The cpu numbering need not be sequential and can something like [0, 2, 4, 6] and [1, 3, 5, 7]. With sched_mc/smt_power_savings and the power-aware IRQ balance, we try to keep as fewer Packages/Cores active. But the current idle load balancer logic goes against this by choosing the first_cpu in the nohz.cpu_mask and not taking the system topology into consideration. Improve the algorithm to nominate the idle load balancer from a semi idle cores/packages thereby increasing the probability of the cores/packages being in deeper sleep states for longer duration. The algorithm is activated only when sched_mc/smt_power_savings != 0. Signed-off-by: Gautham R Shenoy <ego@in.ibm.com> Acked-by: Peter Zijlstra <a.p.zijlstra@chello.nl> LKML-Reference: <20090414045530.7645.12175.stgit@sofia.in.ibm.com> Signed-off-by: Ingo Molnar <mingo@elte.hu>
Showing
Please register or sign in to comment