erp5testnode getting test suites from master
- test node support much less parameters, it will get them from the master - testnode get list of test suite to install - the instance folder structure has changed to support multiple test suites - test node will delete useless test suites data if needed - the master url should be a sub object (distributor) inside the task distibution tool - the long run method has been splitted in many smaller methods (it is still possible to go futher
Showing
This diff is collapsed.
Please register or sign in to comment