sched/fair: Make sure to try to detach at least one movable task
During load balance, we try at most env->loop_max time to move a task. But it can happen that the loop_max LRU tasks (ie tail of the cfs_tasks list) can't be moved to dst_cpu because of affinity. In this case, loop in the list until we found at least one. The maximum of detached tasks remained the same as before. Signed-off-by: Vincent Guittot <vincent.guittot@linaro.org> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Link: https://lkml.kernel.org/r/20220825122726.20819-2-vincent.guittot@linaro.org
Showing
Please register or sign in to comment