We had an incident in a in instance were a user changed state of 70K invoices using https://www.erp5.com/howto/erp5-developer-howto/erp5-HowTo.Change.Workflow.State.Of.Multiple.Documents and leads to user not receiving the reports they requested. `Folder_modifyWorkflowStatus` creates a lot of `callMethodOnObjectList` activities (for all the selected documents) with priority 2, then these activities will cause more reindex an expand activities. Until all these `callMethodOnObjectList` are processed, no new activities with priority > 2 were processed. Some "important for users" activities such as erp5_deferred_style reports where waiting in the queue. I believe we should just set a lower priority to these `callMethodOnObjectList`, eventhough I considered a more clever way of giving the priority: - if the number of selected documents is reasonably small, process them with a very high priority, this way the user can see his document changing state almost immediately as when using the synchronous change state. This should not cause congestion because there are not too many documents. - when there are a lot of selected documents, process them with a very low priority, because anyway it will take time and user will not "wait" for documents to change state. ... but I realized this is trying to be too clever. So any objections to just lower priority here ? /reviewed-on nexedi/erp5!235
-
Jérome Perrin authored
I just simulated an upgrade for an ERP5 running a version from before !185, `ERP5UserManager Non Existence_constraint` properly disabled old `acl_users/erp5_users` and migrated all persons, but `ERP5UserLoginManager Existence_constraint` did not activate `acl_users/erp5_login_users`. This is because `ERP5UserLoginManager Existence_constraint` is registered as a **pre-upgrade** constraint, but with my upgrade scenario, pre-upgrade constraint are installed too late. The upgrade scenario was: 1. install new ERP5 SR on slapos 2. manually install new versions of erp5_upgrader and customer_configuration_upgrader business template 3. run upgrade ( sense then fix on portal_alarms/promise_check_upgrade ) During step 3, when pre-upgrade constraints are executed, erp5_base is not installed yet, so `ERP5UserLoginManager Existence_constraint` can not run because it's not installed yet. My suggestion is to change it to a post-upgrade constraint. If I understand correctly and my upgrade scenario is really the supported one, it means we can only have pre-upgrade constraints in erp5_upgrader. ( I also fix a meaningless typo in the same code) /cc @kazuhiko @vpelletier @seb @gabriel /reviewed-on nexedi/erp5!262
-
- 28 Apr, 2017 2 commits
-
-
Jérome Perrin authored
To be able to use pre_upgrade we would need to install the bt first
-
Jérome Perrin authored
-
- 27 Apr, 2017 1 commit
-
-
Tristan Cavelier authored
-
- 25 Apr, 2017 2 commits
-
-
Kazuhiko Shiozaki authored
-
Kazuhiko Shiozaki authored
-
- 24 Apr, 2017 1 commit
-
-
Vincent Pelletier authored
Because of ERP5Type.UnrestrictedMethod, 'System Processes' can own objects. Such objects can be proxy-role'd scripts, and proxy-role mechanism triggers many users look-ups (each time security is evaluated, which is virtually every getattr). Each such lookup will do a query for 'System Processes' user, which will (hopefully) find nothing anyway. So special-case 'System Processes' when looking by user_id by skipping the search altogether (enforcing the inability to locate this user, consistently with Zope assumptions, and consistently with previous behaviour).
-
- 21 Apr, 2017 4 commits
-
-
Sebastien Robin authored
The code was not working as expected when we had several test nodes with same name (which should not happen). So add a timestamp in the title.
-
Sebastien Robin authored
-
Sebastien Robin authored
test_result: fixed random issues where test result was staying confirmed while all tests were finished When two test results line were stopped in parallel, both transactions were thinking that there was still one ongoing test line, thus none of them were setting the test result in stopped. Use activities instead of serialization to avoid having testnode getting conflict errors.
-
Vincent Pelletier authored
This makes a difference for SQLDict as not all messages are accepted for insertion.
-
- 20 Apr, 2017 14 commits
-
-
Julien Muchembled authored
Firefox and Xvfb aren not provided by the tested SR, but rather by a separate SR that is installed by the testnode.
-
Sebastien Robin authored
-
Sebastien Robin authored
Charting libraries are better within iframe to avoid enabling too permissive Content Security Policy globally
-
Sebastien Robin authored
-
Xiaowu Zhang authored
Fix error display after save Fix parameters not recognized Fix python linting the same way as ERP5 Script Python
-
Klaus Wölfel authored
-
Klaus Wölfel authored
-
Klaus Wölfel authored
-
Klaus Wölfel authored
-
Klaus Wölfel authored
-
Klaus Wölfel authored
-
Klaus Wölfel authored
Add PortalType field to distinguish different types of Python Scripts, add referencence and use source code editor
-
Klaus Wölfel authored
-
Klaus Wölfel authored
-
- 19 Apr, 2017 2 commits
-
-
Jérome Perrin authored
We could not find a portable way to use verifyElementPositionRangeTop. See internal discussion `[test][erp5] update selenium test` for more details.
-
Jérome Perrin authored
-
- 18 Apr, 2017 11 commits
-
-
Julien Muchembled authored
-
Julien Muchembled authored
In addition to TypeEror when a 'date' is given, this also accepts duration=0.
-
Łukasz Nowak authored
If Test Result is associated with Test Node and thus distributor, and distributor defines process timeout use this timeout to now when to restart test lines. This is useful to avoid needless restart of tests running on nodes related to long time outing distributors. Otherwise fallback to default.
-
Łukasz Nowak authored
This link allows to navigate from Test Result via its Test Result Node to Test Node and distributor related to given Test Result. Note: It happens only, if client will do subscribeNode before calling createTestResult.
-
Łukasz Nowak authored
-
Łukasz Nowak authored
This is accompanying commit to "erp5_test_result: stop affecting last remaining tests to all test nodes", where alarms redrafts running tests for long running nodes. In case of very long running test nodes, to which support is introduced in this work, it is acceptable situation that test will get redrafted and shall be stopped.
-
Łukasz Nowak authored
Unfinished test (test_18_checkConfigurationGenerationERP5ScalabilityDistributor) uses return value of subscribeNode and assumes it is ERP5 object. This work changes return value of subscribeNode to JSON object, following startTestSuite return value, thus rendering this test failure. As test is unfinished, non asserting part has been commented out.
-
Łukasz Nowak authored
-
Łukasz Nowak authored
Also if process_timeout is available in received configuration setup process_manager with transmitted value. Backward compatibility is assured, that if no process_timeout is provided, nothing is being updated. Also process_timeout not set on master (the default), will not change local default.
-
Łukasz Nowak authored
-
Łukasz Nowak authored
Extend subscribeNode to send configuration provided by user.
-