-
Marcel Amirault authored
- the environemnt stop job doesn't have a technical requirement to be in the same stage as the deployment as also outlined in the next paragrph, it must be ensured that the stop job can be executed properly the easiest to ensure this is to place the stop job in the same stage as the deploy job
796c2d71