-
Thomas Gleixner authored
Two NOP5s are really a good tradeoff vs. the unholy IDT switching mess, which duplicates code all over the place. The rescheduling interrupt gets optimized in a later step. Make the ordering of function call and statistics increment the same as in other places. Calculate stats first, then do the function call. Signed-off-by: Thomas Gleixner <tglx@linutronix.de> Cc: Andy Lutomirski <luto@kernel.org> Cc: Borislav Petkov <bp@alien8.de> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Steven Rostedt <rostedt@goodmis.org> Link: http://lkml.kernel.org/r/20170828064957.222101344@linutronix.deSigned-off-by: Ingo Molnar <mingo@kernel.org>
85b77cdd