-
Anson Huang authored
Now we support DSM in OCRAM for all i.MX6 SoCs, the resume entry point is set in asm code of suspend-imx6.S, so no need to set the resume entry point for SRC in pre-suspend flow. Signed-off-by: Anson Huang <b20788@freescale.com> Signed-off-by: Shawn Guo <shawn.guo@linaro.org>
df096fde