x86/unwind: Include __schedule() in stack traces
In the following commit: 0100301b ("sched/x86: Rewrite the switch_to() code") ... the layout of the 'inactive_task_frame' struct was designed to have a frame pointer header embedded in it, so that the unwinder could use the 'bp' and 'ret_addr' fields to report __schedule() on the stack (or ret_from_fork() for newly forked tasks which haven't actually run yet). Finish the job by changing get_frame_pointer() to return a pointer to inactive_task_frame's 'bp' field rather than 'bp' itself. This allows the unwinder to start one frame higher on the stack, so that it properly reports __schedule(). Reported-by: Miroslav Benes <mbenes@suse.cz> Signed-off-by: Josh Poimboeuf <jpoimboe@redhat.com> Cc: Andy Lutomirski <luto@amacapital.net> Cc: Andy Lutomirski <luto@kernel.org> Cc: Borislav Petkov <bp@alien8.de> Cc: Brian Gerst <brgerst@gmail.com> Cc: Dave Jones <davej@codemonkey.org.uk> Cc: Denys Vlasenko <dvlasenk@redhat.com> Cc: Dmitry Vyukov <dvyukov@google.com> Cc: H. Peter Anvin <hpa@zytor.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Link: http://lkml.kernel.org/r/598e9f7505ed0aba86e8b9590aa528c6c7ae8dcd.1483978430.git.jpoimboe@redhat.comSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
Please register or sign in to comment