ACPI: Delete the IRQ operation in throttling controll via PTC
The IRQ operation(enable/disable) should be avoided when throttling is controlled via PTC method. It is replaced by the migration of task. This fixes an oops on T61 -- a regression due to f79f06ab b/c FixedHW support tried to read remote MSR with interrupts disabled. Signed-off-by: Zhao Yakui <yakui.zhao@intel.com> Signed-off-by: Len Brown <len.brown@intel.com>
Showing
Please register or sign in to comment