sched/deadline: speed up SCHED_DEADLINE pushes with a push-heap
Data from tests confirmed that the original active load balancing logic didn't scale neither in the number of CPU nor in the number of tasks (as sched_rt does). Here we provide a global data structure to keep track of deadlines of the running tasks in the system. The structure is composed by a bitmask showing the free CPUs and a max-heap, needed when the system is heavily loaded. The implementation and concurrent access scheme are kept simple by design. However, our measurements show that we can compete with sched_rt on large multi-CPUs machines [1]. Only the push path is addressed, the extension to use this structure also for pull decisions is straightforward. However, we are currently evaluating different (in order to decrease/avoid contention) data structures to solve possibly both problems. We are also going to re-run tests considering recent changes inside cpupri [2]. [1] http://retis.sssup.it/~jlelli/papers/Ospert11Lelli.pdf [2] http://www.spinics.net/lists/linux-rt-users/msg06778.htmlSigned-off-by: Juri Lelli <juri.lelli@gmail.com> Signed-off-by: Peter Zijlstra <peterz@infradead.org> Link: http://lkml.kernel.org/r/1383831828-15501-14-git-send-email-juri.lelli@gmail.comSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
kernel/sched/cpudeadline.c
0 → 100644
kernel/sched/cpudeadline.h
0 → 100644
Please register or sign in to comment