Documentation: scheduler: fix outdated information on sched groups
The documentation claims that two sched groups must not overlap. This is no longer true, as overlapping sched groups are used on NUMA systems. This change has been introduced by commit e3589f6c and was documented by an in-code comment in commit 35a566e6. Signed-off-by: Adrian Freund <adrian@freund.io> Link: https://lore.kernel.org/r/20200407130525.76663-1-adrian@freund.ioSigned-off-by: Jonathan Corbet <corbet@lwn.net>
Showing
Please register or sign in to comment