sched/deadline: Do not try to push tasks if pinned task switches to dl
As Kirill mentioned (https://lkml.org/lkml/2013/1/29/118): | If rq has already had 2 or more pushable tasks and we try to add a | pinned task then call of push_rt_task will just waste a time. Just switched pinned task is not able to be pushed. If the rq has had several dl tasks before they have already been considered as candidates to be pushed (or pulled). This patch implements the same behavior as rt class which introduced by commit 10447917 ("sched/rt: Do not try to push tasks if pinned task switches to RT"). Suggested-by: Kirill V Tkhai <tkhai@yandex.ru> Acked-by: Juri Lelli <juri.lelli@arm.com> Signed-off-by: Wanpeng Li <wanpeng.li@linux.intel.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Link: http://lkml.kernel.org/r/1413938203-224610-1-git-send-email-wanpeng.li@linux.intel.comSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
Please register or sign in to comment