-
James Smart authored
Whenever an RRQ needs to be triggered, the DID from the node structure and node pointer are stored in the RRQ data structure and the RRQ is scheduled for later transmission. However, at the point in time that the timer triggers, there's no validation on the node pointer. Reference counters may have freed the structure. Additionally the DID in the node may no longer be valid. Fix by not tracking the node pointer in the RRQ, only the DID. At the time of the timer expiration, look up the node with the did and if present, send the RRQ. If no node exists, no need to send the RRQ. Link: https://lore.kernel.org/r/20210301171821.3427-5-jsmart2021@gmail.comCo-developed-by: Dick Kennedy <dick.kennedy@broadcom.com> Signed-off-by: Dick Kennedy <dick.kennedy@broadcom.com> Signed-off-by: James Smart <jsmart2021@gmail.com> Signed-off-by: Martin K. Petersen <martin.petersen@oracle.com>
2693f5de