-
Antti Palosaari authored
On power-on LNB power supply voltage is disabled, due to that no need to disable it during probe. Tone is supply is hard-coded as external tone coming from the demodulator. Program both voltage and tone on set_voltage(). Use register cache to prevent unneeded programming. Signed-off-by: Antti Palosaari <crope@iki.fi> Signed-off-by: Mauro Carvalho Chehab <mchehab@osg.samsung.com>
4bef67e3