-
Piotr Stankiewicz authored
Certain situations may warrant examining DAPM paths only to a certain arbitrary point, as opposed to always following them to the end. For instance, when establishing a connection between a front-end DAI link and a back-end DAI link in a DPCM path, it does not make sense to walk the DAPM graph beyond the first widget associated with a back-end link. This patch introduces a mechanism which lets a user of dai_get_connected_widgets supply a function which will be called for every node during the graph walk. When invoked, this function can execute arbitrary logic to decide whether the walk, given a DAPM widget and walk direction, should be terminated at that point or continued as normal. Signed-off-by: Piotr Stankiewicz <piotrs@opensource.wolfsonmicro.com> Signed-off-by: Mark Brown <broonie@kernel.org>
6742064a