-
Thomas Gleixner authored
The scheduler can handle per cpu threads before the cpu is set to active and it does not allow user space threads on the cpu before active is set. Attaching to the scheduling domains is also not required before user space threads can be handled. Move the activation to the end of the hotplug state space. That also means that deactivation is the first action when a cpu is shut down. Signed-off-by: Thomas Gleixner <tglx@linutronix.de> Acked-by: Peter Zijlstra <peterz@infradead.org> Cc: rt@linutronix.de Link: http://lkml.kernel.org/r/20160310120025.597477199@linutronix.deSigned-off-by: Thomas Gleixner <tglx@linutronix.de>
aaddd7d1