-
Ilan Peer authored
The code did not consider the case that the channel switch counter is <= 1, which would result with an inaccurate calculation of the time event apply time. As the specification states that in case of counter == 0 the switch occurs at any time after the reception the frame, and for counter == 1 the switch would happens before the next TBTT, schedule the time event immediately. Signed-off-by: Ilan Peer <ilan.peer@intel.com> Signed-off-by: Luca Coelho <luciano.coelho@intel.com>
f5d8f50f