net: use loopback dev when generating blackhole route
Existing ipv4/6_blackhole_route() code generates a blackhole route with dst->dev pointing to the passed in dst->dev. It is not necessary to hold reference to the passed in dst->dev because the packets going through this route are dropped anyway. A loopback interface is good enough so that we don't need to worry about releasing this dst->dev when this dev is going down. Signed-off-by: Wei Wang <weiwan@google.com> Acked-by: Martin KaFai Lau <kafai@fb.com> Signed-off-by: David S. Miller <davem@davemloft.net>
Showing
Please register or sign in to comment