sched/fair: Maintain task se depth in set_task_rq()
Previously we only maintain task se depth in task_move_group_fair(), if a !fair task change task group, its se depth will not be updated, so commit eb7a59b2 ("sched/fair: Reset se-depth when task switched to FAIR") fix the problem by updating se depth in switched_to_fair() too. Then commit daa59407 ("sched/fair: Unify switched_{from,to}_fair() and task_move_group_fair()") unified these two functions, moved se.depth setting to attach_task_cfs_rq(), which further into attach_entity_cfs_rq() with commit df217913 ("sched/fair: Factorize attach/detach entity"). This patch move task se depth maintenance from attach_entity_cfs_rq() to set_task_rq(), which will be called when CPU/cgroup change, so its depth will always be correct. This patch is preparation for the next patch. Signed-off-by: Chengming Zhou <zhouchengming@bytedance.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Reviewed-by: Dietmar Eggemann <dietmar.eggemann@arm.com> Reviewed-by: Vincent Guittot <vincent.guittot@linaro.org> Link: https://lore.kernel.org/r/20220818124805.601-2-zhouchengming@bytedance.com
Showing
Please register or sign in to comment