sched/fair: Update rq clock before updating nohz CPU load
If we're accessing rq_clock() (e.g. in sched_avg_update()) we should update the rq clock before calling cpu_load_update(), otherwise any time calculations will be stale. All other paths currently call update_rq_clock(). Signed-off-by: Matt Fleming <matt@codeblueprint.co.uk> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Reviewed-by: Wanpeng Li <wanpeng.li@hotmail.com> Cc: Frederic Weisbecker <fweisbec@gmail.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mel Gorman <mgorman@techsingularity.net> Cc: Mike Galbraith <efault@gmx.de> Cc: Mike Galbraith <umgwanakikbuti@gmail.com> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Rik van Riel <riel@redhat.com> Cc: Thomas Gleixner <tglx@linutronix.de> Link: http://lkml.kernel.org/r/1462304814-11715-1-git-send-email-matt@codeblueprint.co.ukSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
Please register or sign in to comment