sched/numa: Apply imbalance limitations consistently
The imbalance limitations are applied inconsistently at fork time and at runtime. At fork, a new task can remain local until there are too many running tasks even if the degree of imbalance is larger than NUMA_IMBALANCE_MIN which is different to runtime. Secondly, the imbalance figure used during load balancing is different to the one used at NUMA placement. Load balancing uses the number of tasks that must move to restore imbalance where as NUMA balancing uses the total imbalance. In combination, it is possible for a parallel workload that uses a small number of CPUs without applying scheduler policies to have very variable run-to-run performance. [lkp@intel.com: Fix build breakage for arc-allyesconfig] Signed-off-by: Mel Gorman <mgorman@techsingularity.net> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Tested-by: K Prateek Nayak <kprateek.nayak@amd.com> Link: https://lore.kernel.org/r/20220520103519.1863-4-mgorman@techsingularity.net