sched/topology: Fix building of overlapping sched-groups
commit 0372dd27 upstream. When building the overlapping groups, we very obviously should start with the previous domain of _this_ @cpu, not CPU-0. This can be readily demonstrated with a topology like: node 0 1 2 3 0: 10 20 30 20 1: 20 10 20 30 2: 30 20 10 20 3: 20 30 20 10 Where (for example) CPU1 ends up generating the following nonsensical groups: [] CPU1 attaching sched-domain: [] domain 0: span 0-2 level NUMA [] groups: 1 2 0 [] domain 1: span 0-3 level NUMA [] groups: 1-3 (cpu_capacity = 3072) 0-1,3 (cpu_capacity = 3072) Where the fact that domain 1 doesn't include a group with span 0-2 is the obvious fail. With patch this looks like: [] CPU1 attaching sched-domain: [] domain 0: span 0-2 level NUMA [] groups: 1 0 2 [] domain 1: span 0-3 level NUMA [] groups: 0-2 (cpu_capacity = 3072) 0,2-3 (cpu_capacity = 3072) Debugged-by: Lauro Ramos Venancio <lvenanci@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: linux-kernel@vger.kernel.org Fixes: e3589f6c ("sched: Allow for overlapping sched_domain spans") Signed-off-by: Ingo Molnar <mingo@kernel.org> Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>
Showing
Please register or sign in to comment